Construction project checklist template
Keep a build on track from survey to handover. Permits and inspections sit in the order they happen, so nothing gets built before it is approved.
- 10 steps
- 3 approval steps
- Rename, reorder or remove any step
The 10 steps
- 1
Site survey
Measure the site and record conditions, access and utilities.
- 2
Permits and approvals Approval
Get building permits and any planning approvals.
- 3
Budget and contracts
Agree the budget and sign contracts with the client and trades.
- 4
Procurement
Order materials and book equipment with lead times in mind.
- 5
Foundation
Excavate and pour the foundation.
- 6
Structure
Frame the walls, floors and roof.
- 7
Mechanical, electrical and plumbing rough-in
Run services before walls are closed.
- 8
Inspection Approval
Pass the required inspection before closing up.
- 9
Finishing
Drywall, flooring, fixtures and paint.
- 10
Final inspection and handover Approval
Final sign-off, then hand over keys and documents.